Skip to content
Terrace under re-roofing with the overhead service line made safe for the roofers
Level 2 electrical

Power Disconnection and Reconnection Inner West

We isolate the supply at the network so your builder, roofer or electrician can work safely, then reconnect when they're done.

Get a free quote

Takes a minute. A local level 2 electrician will call you back.

No obligation. Your details only go to one local level 2 electrician.

Turning off your main switch kills the circuits in your home, but it doesn’t make everything safe. The service line from the street, the point of attachment and the consumer mains up to your meter board all stay live. When anyone has to work near those, the supply has to be isolated on the network side. That’s a Level 2 job, and it’s one of the most common things Inner West builders, roofers and electricians call us for.

Common reasons to disconnect

  • Re-roofing. Roofers replacing slate or terracotta on terraces often work right next to the service line and point of attachment.
  • Painting and rendering. Scaffolding and render work on front facades puts trades within reach of the bracket and mains.
  • Renovations and extensions. Rear extensions, second storeys and new kitchens often move the meter board or change the supply.
  • Switchboard upgrades. Your electrician needs the supply off to change the main switch and meter panel.
  • Demolition. A knockdown rebuild needs a permanent disconnection so the site is safe before machinery arrives.

Temporary or permanent

A temporary disconnection isolates your supply while work happens, then we come back to reconnect. Depending on the job, that might be a few hours or a few weeks. We often do the reconnection with other work on the same visit, such as a new point of attachment or a consumer mains upgrade.

A permanent disconnection removes the supply for demolition. We disconnect and remove the service line, make the network side safe and leave the site ready for the builder. If the builder needs power during the build, we set up a temporary builders supply.

How it works

We lock in a date with you and your trades, then lodge the notifications Ausgrid requires. On the day we isolate the supply at the pole, the pit or the point of attachment, depending on the connection, and make everything safe. When your trades finish, we reconnect, test and give you a certificate of compliance.

Terraces and shared supplies

In the Inner West, one disconnection can affect more than one home. Some laneway terraces share a service line or a private pole, and some semis have meters for both houses on one board. We check that before booking, so neighbours can be told in advance and nobody loses power by surprise.

For builders and trades

We work with builders, roofers, painters and electricians across the Inner West every week. Send us the address, the type of work and your dates, and we’ll book the disconnection and reconnection around your program. We can also give you the paperwork your site safety plan needs.

What it costs you in time

A planned disconnection usually takes under an hour on the day, and a reconnection about the same, depending on the supply type. The bigger factor is lead time: Ausgrid notifications and coordinating with your trades. Giving us a few days’ notice means we can lock in the date your roofer or builder actually needs, rather than the next free slot. Where the same visit can also cover a new bracket, a mains upgrade or a meter board move, we combine them so you only lose power once. If your tenants or neighbours will be affected, we can give you a short written notice to pass on, with the date and the expected time without power.

Book a disconnection

Call the Inner West level 2 electricians to lock in your dates. If there’s an immediate safety issue, our emergency level 2 electrician service is available 24/7.

Updated

Disconnection and reconnection is priced on the type of supply (overhead or underground, single or three phase), whether it's temporary or permanent, and how many visits the job needs. We confirm on the phone or on site and give you a fixed price.

What good power disconnection and reconnection looks like

Close-up of power disconnection and reconnection on a home in the Inner West area
What power disconnection and reconnection looks like up close on a typical Inner West area home.
Signs that power disconnection and reconnection needs attention
Typical signs that it needs attention.

Power Disconnection and Reconnection questions in the Inner West

Something else on your mind? Call 0473 522 769 and ask.

When do I need the power disconnected?

Common reasons are re-roofing near the service line, painting or rendering close to it, demolition, switchboard replacement, moving the meter board and work on the consumer mains.

Can I just turn off the main switch?

No. The main switch turns off your circuits, but the service line and consumer mains up to the meter board stay live. Work near those needs the supply isolated at the network side.

How much notice do you need?

A few days is ideal so we can lodge the notifications and lock in the date with your trades. Urgent disconnections for safety can be done faster.

Power Disconnection and Reconnection in the Inner West: step by step

  1. Plan the datesWe agree the disconnection and reconnection dates with you and your builder or trades.
  2. Notify AusgridWe lodge the required notifications with Ausgrid before we touch the supply.
  3. Disconnect safelyWe isolate the supply at the pole, pit or point of attachment and make the service line safe.
  4. Reconnect and testWhen the work is done, we reconnect, test and certify so you're back on power.

Need a Level 2 electrician in the Inner West?

📞 Call now Free quote