Point of Attachment Upgrade Inner West
Moving or raising where the overhead service line meets your house, for extensions, clearances and safety.
The point of attachment is where the overhead service line from the street meets your house. On most Inner West homes it’s a steel bracket on the front facade, a fitting under the eaves or a pipe raiser above the roofline. It holds the full weight and tension of the service line, and it decides how high that line sits over your footpath, driveway and roof.
When the point of attachment needs work
We get called to points of attachment for a handful of reasons:
- Renovations. A second storey, a new roof pitch or a dormer can put the old bracket in the wrong place, or bury it in new walls.
- Clearances. A new carport, raised driveway or garage door can leave the service line too low. The Service and Installation Rules of NSW set minimum heights over footpaths, driveways and roofs, and Ausgrid will issue a defect if they aren’t met.
- Damage. Old brackets rust, the fixings pull out of soft brick, or a truck or tree pulls the line and loosens the whole fitting.
- Moving the meter board. If the meter board is being relocated, the attachment often moves too.
A loose bracket or a line that suddenly drops is urgent. Keep clear and call our emergency level 2 electrician team.
Brackets and raisers
Where the wall is high enough, a new bracket fixed into sound brickwork does the job. On single-storey terraces and cottages, where the eaves are low, the usual answer is a raiser: a galvanised steel pipe fixed to the wall or through the roof that lifts the attachment point to the right height. Raisers are designed and fixed to carry the line tension, which is why they have to be installed properly rather than improvised.
We pick a position that meets the clearances, suits your plans and keeps the facade as tidy as possible. In heritage areas across Annandale, Glebe and level 2 electrician Balmain streets, that usually means placing the attachment at the side or rear and painting fittings to blend in.
Doing it with other work
Moving the point of attachment nearly always means extending or replacing the consumer mains between the bracket and the meter board. If those mains are old VIR cable, it makes sense to do a full consumer mains upgrade at the same time. If you’re renovating, we can also handle the power disconnection and reconnection your builder needs, and come back to reconnect to the new attachment once the walls are up.
If the overhead line is causing more trouble than it’s worth, it’s worth pricing an overhead to underground conversion instead.
On the day
We lodge the notification with Ausgrid, disconnect the supply, fit the new bracket or raiser, extend the mains and transfer the service line. Then we reconnect, test and give you a certificate of compliance. Most jobs take a few hours to a day.
Clearances in plain terms
The rules set minimum heights for an overhead service line over footpaths, driveways, roofs and areas people can walk on, and they set distances from windows, balconies and pools. They exist because a low line can be hit by a truck, touched from a balcony or reached by a ladder. On Inner West terraces the usual problem is a single-storey facade with a low bracket and a line dropping over the front path. A raiser lifts it clear. If you’re building a balcony, a deck or a pool near where the line runs, tell us at the planning stage so the attachment is placed correctly from the start.
Get a quote
Call your level 2 electrician Inner West team for a free site visit and a fixed price.
Updated
What good point of attachment upgrade looks like
Point of Attachment Upgrade questions in the Inner West
Something else on your mind? Call 0473 522 769 and ask.
What is a point of attachment?
It's the bracket or fitting on your house where the overhead service line from the street pole is fixed. From there, your consumer mains run to the meter board.
Why would I need to move it?
Common reasons are a second-storey addition, a new roof, a carport or driveway that puts the line too low, a bracket that has pulled loose, or an Ausgrid defect notice about clearances.
Is a raiser ugly on a terrace?
It doesn't have to be. We position raisers as discreetly as the rules allow and paint them to match where needed, which matters in heritage conservation areas.
Point of Attachment Upgrade in the Inner West: step by step
- Check clearancesWe measure how high the service line sits over footpaths, driveways and roofs and check the bracket condition.
- Pick the new positionWe choose a new spot or raiser that gives proper clearance and suits your plans and the street view.
- Install and transferWe fit the bracket or raiser, extend the mains if needed and transfer the service line across.
- Reconnect and certifyWe reconnect to the Ausgrid network, test and give you the certificate of compliance.