Temporary Builders Supply Inner West
Safe, compliant site power for knockdown rebuilds, extensions and new builds, connected to the Ausgrid network.
Every build needs power from day one, and on most Inner West sites the old house supply is either gone or in the way. A temporary builders supply gives your trades safe, metered power for tools, lighting and site sheds, connected properly to the Ausgrid network rather than run off a neighbour’s extension lead.
What a temporary supply looks like
On most residential sites the temporary supply is a temporary pole or a freestanding site board near the front boundary. It carries a meter, a main switch, safety switches and outlets for the trades. On tight Inner West blocks it often sits at the front corner of the site or against a side fence, where it’s out of the way of excavators and deliveries.
The supply connects to the street either overhead, from the nearest Ausgrid pole, or underground from a pit where the street has underground mains.
Planning it with your builder
The best time to plan site power is before demolition. If the old house is coming down, we can do the permanent disconnection of the old supply and set up the temporary supply in the same visit, so the site is never without power. See our power disconnection and reconnection page for how that works.
We’ll need:
- The site address and the builder’s contact
- A site plan showing where the temporary supply can go
- Whether the build needs single phase or three phase power
- Your expected start date
You’ll also need an electricity retailer account for the site so the meter can be fitted. We tell you what to ask for.
Single phase or three phase
Most house builds run on single phase site power. Larger builds, or builds where the finished home will have three phase power, often use three phase from the start. It runs bigger tools, a site crane or a hoist, and it means the street capacity has been confirmed early.
At the end of the build
When the new meter board is in and the electrician has finished, we connect the permanent supply. That might be overhead to a new point of attachment, or underground if you’ve chosen an overhead to underground conversion for the new house. Then we disconnect and remove the temporary supply. You get a certificate of compliance for the permanent connection.
Safety on site
Temporary supplies get knocked, rained on and moved. We install them to stand up to that, and if your site has any overhead lines near the work area, we can advise on keeping trades and machinery clear. If a temporary pole or board is damaged during the build, call our emergency level 2 electrician line.
Common hold-ups and how to avoid them
The most common delays on site power come from paperwork rather than the work itself. The retailer account for the site isn’t set up, so there’s no meter. The temporary pole is placed where the excavator needs to go. The builder needs three phase but only single phase was requested. Or demolition is booked before the old supply is disconnected. We go through these with you at the start, give you a short checklist for the retailer and the builder, and book the disconnection and the temporary connection in the right order. That’s usually the difference between power on the first day of the build and a week of generators.
Book site power
Builders across the area use us for site power on knockdown rebuilds in level 2 electrician Concord, Drummoyne and Five Dock. Call your Inner West level 2 electrician to book.
Updated
What good temporary builders supply looks like
Temporary Builders Supply questions in the Inner West
Something else on your mind? Call 0473 522 769 and ask.
Who arranges the meter?
The site needs an electricity retailer account so a meter can be installed on the temporary supply. We tell you exactly what to ask the retailer for.
Can the temporary supply be three phase?
Yes, if the street has three phase available and the build needs it. Larger builds with lifts, welders or big tools often do.
What happens at the end of the build?
We connect the permanent supply to the new meter board, then disconnect and remove the temporary pole or board.
Temporary Builders Supply in the Inner West: step by step
- Plan the site supplyWe look at the site plan, the connection point and where the temporary pole or board can stand.
- Apply and bookWe lodge what Ausgrid needs and you arrange a retailer account so a meter can be fitted.
- Install and connectWe install the temporary supply, connect it to the network and test it.
- Switch to permanentAt the end of the build we connect the permanent supply and remove the temporary one.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.